Tanso Construction & Installation
Project Completed
EPC project of complete reconstruction and overhaul of 250 000 barrels of storage facilities situated in Kharg Island
:::::
Project location | Kharg Island, Iran |
---|---|
Main employer | |
Employer | |
Project start date | 2014 |
Project progress percentage | 100% |
Project description:
- Civil: Foundation Repair Tank, Drain water pool, Pipe Sleeper, Paving, Access Road, bound wall, Cable trench, Piping Chanel, Ramp
- Mechanical: Overhaul of 250,000 barrels of crude oil tank Including design and procurement and preparation tank, and Fabrication & Erection the floor and Shell & Roof and other equipment, including valves and tank accessories ..., 36-inch pipeline, Drain Polyethylene Piping
- Electrical and I&C: Cable System, Lighting System, cathodic Protection System, Field Instrument.